Private Networks

 

Engineering & implementation

ClientNatureScopeStartDuration(years)
British gasTurnkeyDesign and planning of Wifi backhauling solutions. Assistance with equipment supply, implementation commissionning and integration2004
1
CPCTurnkeyDesign and planning of horizontal fall protection solutions. Supply and implementation2006
1
MonogrosTunrkeyDesign and planning of GPRS/GPS location tracking solution for fleet managament. Equipment supply, implementation commissionning and integration of GPRS/GPS location based solution2006
SCETurnkeyDesign and planning of Wifi backhauling solutions. Assistance with equipment supply, implementation commissionning and integration2005
1
STARTurnkeyDesign and planning Wifi backhauling solutions. Assistance with equipment supply, implementation commissionning and integration2006
0.5
 Tunisie VoyagesTurnkeyDesign and planning Wifi backhauling solutions. Assistance with equipment supply, implementation commissionning and integration2005
1
AFAQ